代写thesis proposal:公司治理作为企业绩效的价值
1 Background of research1研究背景 随着公司的出现和发展,公司治理也随之出现,成为专家学者关注的焦点。英国作为第一个国家兴起公司之一,公司治理体系
2019-10-25
Building Measurement 1
Assessment Brief 2016
You have been supplied the designs of two different institutional building projects. You are
required to:
• choose any of these,
• use any software application,
• measure (i.e. show all your calculations in a take-off format) and prepare bill of
quantities for any three of the following:
o masonry
o doors and windows
o roof frame
o roof covering
o floor finishes
o timberwork
o external paving
• make reasonable assumptions where necessary – and document all your assumptions in
your query sheet,
• document your answers (i.e. take-off and BoQ) only as soft copies, ensure you convert
all your documents into a single portable document format file,
• submit only through turnitin, before 11:59pm of May 06, 2016,
• keep a receipt of your submission intact.
Building Measurement 241: Marking Rubric
Student Name Student ID
Attribute Fail
(0-49%)
Pass
(50-64%)
Credit
(65-74%)
Distinction
(75-84%)
High Distinction
(85-100%)
Formatting (10%):
Cover (Assignment title, student IDs
etc)
Adherence to conventions (preamble,
take-off list, page referencing, drawing
numbers, job reference etc)
Packaging (neatness, evidence of
professionalism in student’s work,
overall quality of submission)
Collection and summary formatting
No/incomplete cover sheet
Poor understanding of take-off
conventions
No take-off list
Poor page referencing
No preamble
Job reference/Drawing
numbers not stated
Submission is rough and untidy
Poor quality of work
No collection and Summary cells
Complete but messy cover sheet
Superficial understanding of take-off
conventions
Incomplete take-off list
Confusions page referencing
Ambiguous preamble
Clear job reference/ Drawing numbers
not stated
Submission is somewhat untidy
Acceptable quality of work
Collection and summary cells poorly used
Exceptional quality of presentation;
strong evidence of understanding
and fulfilment of task requirements;
take-off is perfect; use of
convention is faultless; pages
properly referenced; clear preamble
to measured work; clear referencing
of job, drawing numbers and
measurement work-sheet pages;
tidy submission, and; Collection
and Summary cells perfectly used
and shown.
Take-off (40%
Accuracy of data entry
Use of take-off conventions
Precision of description
Quality of outcome/reportage of data
processing
Integrity of submission
Poor style of data entry
Proper understanding of Take-off
conventions not demonstrated
Lack of precision in descriptions
Many unsubstantiated calcs
Error in quantity measurement
processes (extension, timesing
etc)
Integrity concern on submission
Faulty style of data entry
Some typo/grammatical blunders/long
rambling descriptions
Few unsubstantiated calcs
Project not measured in appropriate context
Unconvincing, untidy
Few clarity and precision issues
No integrity concern on submission
Strong content
Exceptional professional judgment
No grammatical error
High quality of reflection on project
context
Exceptional writing style
Most calcs are substantiated with
sketches and worked up dimensions
Work is clear and precise
No integrity concerns
Bill of Quantities (50%)
Accuracy of measured quantities
Precision of description
Accurate itemization of measured work
Robustness/completeness of
measurements
Adherence to A/SMM rules
>50% of measured work lacks
accuracy
>50% of work description is not
implementable
Lack of technical depth
>50 of appropriate items omitted
in the Bill
A/SMM rules not adhered to in
more than 50% of measured items
<50% of measured work lacks accuracy
<50% of work description is not
implementable
Lack of technical depth
<50 of appropriate items omitted in the Bill
A/SMM rules not adhered to in less than
50% of measured items
All items are measured accurately
All work description are perfect and
implementable
Exceptional technical depth
No appropriate item is omitted in
the Bill
All A/SMM rules are adhered to in
all the measured items
Total Marks Comments
BUILDING MEASUREMENT - QUERY SHEET
Blank Query Sheet.xls BM Page 1 of 1 28/03/2014 9:42 AM
Student's Name:
Student's Number:
Project:
No. Date Query Answer By Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Project Option 1 – Mussalla Building
MUSALLA - BUILDING 510 - LEVEL 01 2012
PROJECT NUMBER UPJ0246 VOL. 1 OF 1
COVER PAGE
DOCUMENTATION BY:
ARMSTRONG PARKIN ARCHITECTS
41 HIGH STREET FREMANTLE W.A. 6160
BENTLEY CAMPUS
University Properties
University of Technology
G G
H
D D E M O L I T I O N N P L A N N
1:200
WESTERN AUSTRALIA 6160
ABN 52 009 237 601
T: 9433 8 1388 F: 9433 1991
This drawing is copyright and shall always remain the property f of
ARMSTRONG PARKIN PTY LTD and must not be used in any manner t without
the prior written approval of that company. Verify all dimensions on site d and
report all discrepancies to the Architect. Await Architect's instructions r prior
to the commencement of construction or fabrication.
mail@armstrongparkin.com.au
NORTH
0 0
PROJ
APP
REVISION REV DATE N DRN CHK
SP AS CONSTRUCTED 17.06.13 CC SP
EXISTING BUILDING 212
TEXTILES + PRINTMAKING
EXISTING
BUILDING 221
GPO BOX U1987 PERTH WA 6845
TEL 9266 6 9266 FAX 9266 2660
University Properties
University of Technology
DRN BY
CLIENT APP
DESIGNED
DATE
CHECKED
PROJ APP
This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the
sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an
agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or
given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the
above above may may attract attract claims claims for for compensation. compensation.
CHECK SITE DIMENSIONS
AND VERIFY DRAWINGS
PRIOR TO CONSTRUCTION
BENTLEY CAMPUS
UPJ0246
01B510-A-DP0102
02 25 0 0
1:200
AS CONSTRUCTED
A1
AW
31-05-2012
SP
SP
SP
CURTIN
ISSUE
CURTIN
PROJ No
SCALE
DWG No
G DWG
STATUS
SHEET OF
SHEET
SIZE
MUSALLA
DEMOLITION PLAN
BLDG 510 LEVEL 01
R7
R1
R1
R1
G G
H
S S I T E E P L A N N
1:200
E MALE
ENTRY
E FEMALE
ENTRY
RETAIN AND T PROTECT
G EXISTING VEGETATION
RETAIN AND T PROTECT
G EXISTING VEGETATION
RETAIN AND T PROTECT
G EXISTING VEGETATION
EXISTING BUILDING 212
TEXTILES + PRINTMAKING
RETAIN AND PROTECT G EXISTING
PATHWAY
REALIGNED SEGMENTAL D PAVED
PATHWAY REFER TO E LANDSCAPE
DOCUMENTATION
SEGMENTAL PAVED . PATHWAY.
REFER TO E LANDSCAPE
DOCUMENTATION
SEGMENTAL PAVED . PATHWAY.
REFER TO E LANDSCAPE
DOCUMENTATION
RETAIN AND T PROTECT
G EXISTING PATHWAY
CONTRACTORS D COMPOUND
WITHIN CARPARK 9B
WESTERN AUSTRALIA 6160
ABN 52 009 237 601
T: 9433 8 1388 F: 9433 1991
This drawing is copyright and shall always remain the property f of
ARMSTRONG PARKIN PTY LTD and must not be used in any manner t without
the prior written approval of that company. Verify all dimensions on site d and
report all discrepancies to the Architect. Await Architect's instructions r prior
to the commencement of construction or fabrication.
mail@armstrongparkin.com.au
NORTH
0 0
PROJ
APP
REVISION REV DATE N DRN CHK
SP AS CONSTRUCTED 17.06.13 CC SP
E FEMALE
COURTYARD
E MALE
COURTYARD
BUILDING 501
MUSALLA
FFL 5 9.475
RETAIN AND PROTECT G EXISTING
GRASSED AREA
LINE OF COURTYARD FENCE TO MALE + E FEMALE
COURTYARDS. REFER TO DRAWING CP0104
GARDEN BED R REFER
TO E LANDSCAPE
DOCUMENTATION
GARDEN BED. REFER O TO
LANDSCAPE DOCUMENTATION.
SEGMENTAL PAVED PATHWAY. REFER O TO
E LANDSCAPE DOCUMENTATION. .
STONE H MULCH
GROUND . TREATMENT.
REFER TO E LANDSCAPE
DOCUMENTATION
RETAIN AND T PROTECT
G EXISTING GRASSED AREA
VERANDA
WW102
FFL 9.475
VERANDA
WW101
FFL 9.475
MUSALLA
SITE PLAN
BLDG 510 LEVEL 01
EXISTING TREE
LEGEND
EXISTING TITLE/LOT BOUNDARY
EXISTING FENCE
EXISTING BUILDING
E E X I S T I N G
EXISTING CONTOUR LEVEL
29
30.35
EXISTING SPOT LEVEL
N N E W W W O R K S
EXTENT OF NEW BUILDING WORKS
RL 30.38
NEW LEVEL
CONCRETE
EXTENT OF CONTRACTORS FENCE LINE
NEW TREE
NOTE: :
. 1. UNLESS OTHERWISE NOTED ALL WORK SHOWN ON S THIS
DRAWING IS NEW WORK
. 2. CONNECTION BETWEEN ADJACENT SURFACES: H MATCH
DIMENSIONS + LEVELS OF NEW SURFACE WITH EXISTING. E ENSURE
FLUSH + EVEN TRANSITION BETWEEN SURFACES. MAXIMUM L VERTICAL
DISTANCE 5MM UNLESS D NOTED OTHERWISE
. 3. ENSURE TO CO-ORDINATE INFORMATION IN THIS G DRAWING
WITH OTHER ARCHITECTURAL DOCUMENTATION AND ALL D ASSOCIATED
CIVIL, STRUCTURAL, HYDRAULIC, , ELECTRICAL + E LANDSCAPE
DOCUMENTATION
GAS/WATER R METER
BOX . ENCLOSURE.
REFER TO DETAIL 3 123
ON DRAWING FD0122
A CAMERA
POLE.
REFER O TO
, ELECTRICAL,
STRUCTURAL + +
Y SECURITY
DOCUMENTATION
L L O C A T I O N N P L A N N
1:5000
NORTH
BUILDING 501
MUSALLA LOCATION
PAVING DRAINS
REFER O TO
C HYDRAULIC
S ENGINEERS
DOCUMENTATION
SETOUT POINT
NEW CONTOUR LEVEL
29
212
MANNING ROAD
BRAND DRIVE
EXTENT OF S CONTRACTORS
COMPOUND N WITHIN
CARPARK 9B
SEGMENTAL PAVEMENT. REFER TO LANDSCAPE DOCUMENTATION
SETOUT POINT 1
64.4068
NORTH
QIBLA
CONTRACTORS FENCE LINE
CAMERA POLE. REFER O TO
ELECTRICAL, STRUCTURAL + +
SECURITY DOCUMENTATION
SEGMENTAL D PAVED
PATHWAY. R REFER
TO E LANDSCAPE
DOCUMENTATION. .
ORIENTATION E RELATIVE
TO NORTH
MARQUEE R POWER
SUPPLY. REFER O TO
L ELECTRICAL
DOCUMENTATION
SETOUT POINT 2
DOB
LINE OF SUSPENDED N CURTAIN
OVER SHOWN DASHED
FR
FR
S S
NB
NB
RECESSED R ROLLER
SHUTTER
LINE OF ROOF OVER
SHOWN DASHED
FFL 9.475
BOOK SHELVING UNIT TYPE A
REFER TO DETAIL 110 N ON
DRAWING FD0121
CORIAN T SEAT
ESSB MSSB
1 1 2 2 3 3
FIBRE , COMMS.,
SECURITY S SERVICES
+ AV RACK. R REFER
TO L ELECTRICAL
DOCUMENTATION
AUDIO CONTROL T CABINET
REFER TO L ELECTRICAL
DOCUMENTATION
FEMALE ABLUTIONS
106
TILES
MALE PRAYER SPACE
101
CARPET
STORE 1.
104
VINYL
MALE KITCH.
103
TILES
MIHRAB
101
CARPET
MALE ABLUTIONS
107
TILES
. COMMS.
ROOM
D101
ANTISTATIC VINYL
STORE 2.
102
VINYL
ACCESS TOILET
110
TILES
FEMALE KITCH.
105
TILES
FEMALE PRAYER SPACE
101
CARPET
FEMALE ENTRY
C102
CARPET TYPE 2
E FEMALE
VERANDA
WW102
SEALED CONCRETE
A
SE0107
B
SE0107
A
SE0107
C
SE0108
C
SE0108
D
SE0108
B
SE0107
D
SE0108
GENERAL LEGEND
TOILET ROLL HOLDER TRH
HB HAND BASIN
SD SOAP DISPENSER
ATRH ACCESS TOILET ROLL HOLDER
PB PAPER TOWEL DISPENSER H WITH INTEGRATED N BIN
AT ACCESS TOILET
ST SQUAT TOILET
FM FLOOR MAT
DOB DONATION BOX. REFER TO DETAIL 117 ON DRAWING FD0121
LEGEND
CORRIDOR 2
C102
FLOOR MAT
40
CD0117
41
CD0117
28
CD0116
08
CD0110
03
CD0110
29
CD0116
109
FD0120
38
CD0111
CORIAN T SEAT
DOB
FB FLOOR BOX. REFER TO ELECTRICAL DOCUMENTATION
T T TOILET
WASH TROUGH WT
FFL 9.475
CLNR
111
VINYL
NOTES
1.
UNLESS OTHERWISE NOTED ALL STUDWORK S IS
DIMENSIONED TO FACE OF STUD
50 DIAMETER SIPHONIC RWDP AND 0 50
DIAMETER SIPHONIC OVERFLOW K PIPEWORK
DROPPERS IN STUD WALL
E FEMALE
COURTYARD
SEALED CONCRETE
FFL 9.445
E MALE
VERANDA
WW101
SEALED CONCRETE
FFL 9.475
E MALE
COURTYARD
SEALED CONCRETE
FFL 9.445
37
CD0111
4 4 5 5 6 6 7 7 8 8 9 9
UP
LINE OF GLAZING W BELOW
SHOWN DASHED
LINE OF GLAZING W BELOW
SHOWN DASHED
UP
UP
E101
S SERVICES
CUPBOARD
REFER O TO
DETAIL 8 128
ON G DRAWING
FD0123
FEMALE SCREEN. REFER TO DETAIL 0 120
ON DRAWING FD0122
MALE SCREEN. REFER O TO
DETAIL 119 ON G DRAWING
FD0122
CUPBD CUPBOARD
CUPBD
ROOF ACCESS LADDER
D1
01
D2
02
D4
03
D5
04
D4
05
D3
06
D1
07
08
D7
D8
09
D6
10
D6
11
D7
12
W1
01
W3
02
W3
03
W2
04
FFL 9.475
` `
RECESSED R ROLLER
SHUTTER
D9
13
S S
S S
75 DIAMETER SIPHONIC RWDP AND 5 75
DIAMETER SIPHONIC OVERFLOW K PIPEWORK
DROPPERS IN STUD WALL
75 DIAMETER SIPHONIC RWDP AND 5 75
DIAMETER SIPHONIC OVERFLOW K PIPEWORK
DROPPERS IN STUD WALL
50 DIAMETER SIPHONIC RWDP AND 0 50
DIAMETER SIPHONIC OVERFLOW K PIPEWORK
DROPPERS IN STUD WALL
JOINT IN CORIAN
SEAT
JOINT IN CORIAN SEAT
TENSIONED FABRIC SCREEN N ON
FABRICATED H.D. GALV L STEEL
FRAMING
CARPET
TYPE 1
CARPET
TYPE 2
CARPET
TYPE 1
CARPET
TYPE 2
CARPET
TYPE 1
CARPET
TYPE 2
CARPET
TYPE 1
CARPET
TYPE 2
CARPET
TYPE 1
BOOK SHELVING UNIT TYPE B
REFER TO DETAIL 112 N ON
DRAWING FD0121
BOOK SHELVING UNIT TYPE B
REFER TO DETAIL 112 N ON
DRAWING FD0121
SHOE STORE T UNIT
REFER TO L DETAIL
118 ON G DRAWING
FD0121
CARPET
TYPE 2
FOR CONTINUATION OF COURTYARD LAYOUT REFER TO DRAWING CP0104
2.
REFER TO DRAWINGS RE0118 + RE0119 FOR M ROOM
LAYOUTS
10
CD0111
E
SE0107
E
SE0107
FB FB
FB FB
CD0113
16
CORIAN T SEAT
LINE OF ROOF R OVER
SHOWN DASHED
TENSIONED FABRIC SCREEN N ON
FABRICATED H.D. GALV L STEEL
FRAMING
LINE OF ROOF R OVER
SHOWN DASHED
CORIAN T SEAT
LINE OF ROOF OVER
SHOWN DASHED
SHOE STORE UNIT R REFER
TO DETAIL 118 N ON
DRAWING FD0121
TIMBER STUD FRAMED WALL WITH INSULATION AS . SPECIFIED.
TYPICALLY ALL INTERNAL WALLS ARE LINED H WITH
PLASTERBOARD AS SPECIFIED TO BOTH SIDES EXCEPT E MALE
+ FEMALE ABLUTIONS, ACCESS TOILET + CLEANER H WHICH
ARE TO BE LINED H WITH FIBRE CEMENT SHEETS S AS
SPECIFIED. ALL EXTERNAL WALLS TO BE LINED L INTERNAL
WITH PLASTERBOARD. REFER TO M ROOM ELEVATIONS + +
SECTIONS FOR FINISHES. REFER TO EXTERNAL S ELEVATIONS
FOR FINISH TO EXTERNAL WALLS.
PLYWOOD LINED TIMBER TRUSS WITH INSULATION S AS
SPECIFIED. REFER TO STRUCTURAL S ENGINEERS
DOCUMENTATION. INSIDE FACE OF PLYWOOD TRUSS N WITHIN
MALE ENTRY, MALE PRAYER SPACE, FEMALE , ENTRY, E FEMALE
PRAYER SPACE TO BE LINED WITH PLASTERBOARD S AS
SPECIFIED. REFER TO EXTERNAL ELEVATIONS FOR FINISH O TO
EXTERNAL FACE.
OUTSIDE FACE F OF
PLYWOOD TRUSS S IS
SETOUT LINE
OUTSIDE FACE F OF
PLYWOOD TRUSS S IS
SETOUT LINE
F101
E FIRE
R EXTINGUISHER
LOCATED N IN
CUPBOARD
SERVICES CUPBOARD. REFER TO L DETAIL
132 ON DRAWING FD0123
F102
FIRE EXTINGUISHER D LOCATED
IN CUPBOARD
39
CD0113
CURTAIN 2
CURTAIN 1
LINE OF G CLADDING
BELOW TRUSS N SHOWN
D DASHED
LINE OF G CLADDING
BELOW TRUSS N SHOWN
D DASHED
32
CD0117
114
FD0121
ACCESS PANEL AT HIGH LEVEL
MALE ENTRY
C101
CARPET TYPE 1
CORRIDOR 1
C101
FLOOR MAT
CORIAN N SCREEN
PANEL
CD0111
36
125
FD0122
125
FD0122
1045 2840
120
3630 120 2220 120
6000
3745
120
2925 0 1020 180 2170 900 1475 950 520
4500
120 2055
D7 G OPENING D4 OPENING
100 1120 835
120
D6 OPENING
680
4425
300
2925 120 4720 9750
2 W2
FEMALE N KITCHEN STORE FEMALE ABLUTIONS
FEMALE ENTRY + CORRIDOR 2
6135
FEMALE PRAYER SPACE FEMALE / MALE PRAYER SPACE
STORE
70
CLEANER
120
ACCESS TOILET
4125 120
FEMALE VERANDA
1045 2840 120 2625
6000
650 600 2380
120
2925 0 1020 180 900 1860 465
120 2055
100 1120 835
120
4425
300 1845
150
2040 1800 2925 120
23175
8250
7635
70
120
775 120
4125 120
MALE VERANDA MALE ENTRY / CORRIDOR 1
3210
1 W1
COMMS. ROOM
1845
150
MALE PRAYER SPACE
D4 OPENING D7 G OPENING
MALE ABLUTIONS
1785
3000
D6 OPENING
MALE N KITCHEN
9 D9
120
2220 120
STORE ACCESS TOILET CLEANER
365 5235 365
150 395 120
4935
120
600 900 1260
120
D5 OPENING
R CLEANER
MALE VERANDA
5235
FEMALE VERANDA
4935
150 395 120
2760
ACCESS T TOILET
2760
1850 1080 1570
D1 OPENING D3 OPENING
1850 1080 1570
D1 G OPENING
D2 OPENING
3525 120 3370 120 2090
MALE ABLUTIONS FEMALE ABLUTIONS
120 3525
1870
645 1445
W3
120
3815 120
MALE PRAYER SPACE
2625
2640 1200 120 980
MALE ENTRY / CORRIDOR 1 FEMALE ENTRY / CORRIDOR 2
4500
1870
6000
1200
1200
600 120
200 155
120
SETOUT POINT - -
END OF PLYWOOD TRUSS
70
70
725 190
SETOUT POINT - -
END OF PLYWOOD TRUSS
440 2200 8920 440 2200
150
170
120 120 2280
COMMS. ROOM
120 3880 120 2280
STORE 2.
120
W3
150
170
120
4505
FEMALE PRAYER SPACE
MALE PRAYER SPACE
120 4650
550 850 3250
D8
1200 455 1870
CORRIDOR 1 MALE ENTRY
515 465 3525
2205 120 2325
MALE KITCH.
FEMALE KITCH.
465
1200 455 1870
3525
515 3990
585 585
2910 2790
MIHRAB
FEMALE ENTRY CORRIDOR 2
14200
TRUSS
TRUSS
TRUSS
TRUSS
2690 620
C
L L
C
L L
3560 405
C
L L
C
L L
530
C
L L
2120
C
L L
109 9
108
600 600 100 100
FE
FE FIRE EXTINGUISHER
FE
MIN.
CLEAR
1 1
A
2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 11 12
B
C
D D
E E
F
G G
H
A A
B
C
D D
E E
F F
G G
H
F F L O O R R P L A N N
1:50
WESTERN AUSTRALIA 6160
ABN 52 009 237 601
T: 9433 8 1388 F: 9433 1991
This drawing is copyright and shall always remain the property f of
ARMSTRONG PARKIN PTY LTD and must not be used in any manner t without
the prior written approval of that company. Verify all dimensions on site d and
report all discrepancies to the Architect. Await Architect's instructions r prior
to the commencement of construction or fabrication.
mail@armstrongparkin.com.au
MUSALLA
FLOOR PLAN
0 0
PROJ
APP
REVISION REV DATE N DRN CHK
SP AS CONSTRUCTED 17.06.13 CC SP
NORTH
GPO BOX U1987 PERTH WA 6845
COL
代写 Building Measurement
9595 NOMINAL
SLAB EDGE
R R 1510
SLAB EDGE
R R 4000
SLAB EDGE
R R 1450
SLAB EDGE
2370
2370
SLAB EDGE
47°
60°
64°
SLAB EDGE
SLAB EDGE
50 1375 1000 650 50 1375 1000 650
COL
COL
LIGHT POLE. REFER O TO
ELECTRICAL S ENGINEERS
DOCUMENTATION
CONCRETE SLAB EDGE. RL 9.445
TAP TAP TAP TAP TAP
CONCRETE B SLAB
EDGE. RL 9.445
CONCRETE SLAB . EDGE.
RL 9.445
CJ
3850
4270
3 3 NO. TREE . GRATES.
REFER TO E LANDSCAPE
DOCUMENTATION
SCREEN WALL. PAINT D FINISHED
F.C. SHEET CLADDING TO H BOTH
SIDES OF FABRICATED H.D. V GALV
G FRAMING BETWEEN MALE +
FEMALE COURTYARDS
TAP TAP
WASH TROUGH WT
FALL
DRAIN GRATE
FALL
FALL
COURTYARD DRAIN RL 9.420
REFER TO HYDRAULIC S ENGINEERS
DOCUMENTATION
COURTYARD DRAIN RL 9.420
REFER TO C HYDRAULIC
ENGINEERS DOCUMENTATION
CD0117
33
CD0117
34
FD0120
107
-
- -
CD0117
35
CJ
CJ
SETOUT POINT 3
SETOUT POINT 2
CJ
SCREEN FENCE PROFILED L METAL
CLADDING TO BOTH SIDES F OF
H.G. GALV STEEL COLUMNS.
CD0117
33
R2
L FFL 9.4 45
L FFL 9.4 45
R1
COL
COL
FALL FALL
FALL FALL
FALL
FALL
FALL
FALL
R3
EDGE OF WATER WASHED
CONCRETE
REFER TO DRAWING FP0103 FOR CONTINUATION
ALUMINIUM CLADDING TO H BOTH
SIDES OF FABRICATED . H.D.
GALV STEEL FENCE PANELS
ALUMINIUM CLADDING TO H BOTH
SIDES OF FABRICATED . H.D.
GALV STEEL FENCE PANELS
EDGE OF WATER WASHED
CONCRETE
STONE MULCH. REFER O TO
LANDSCAPE DOCUMENTATION
SETOUT R2
1540
C C
SETOUT R1
SETOUT LINE FOR COURTYARD
FROM END OF PLYWOOD TRUSS
LINE OF SLAB EDGE
C
1150
TREE GRATE
SETOUT
SCREEN FENCE. D PROFILED
METAL CLADDING TO H BOTH
SIDES OF H.D. V GALV
STEEL COLUMNS
2700
1200
C
FACE OF MALE D COURTYARD
SLAB EDGE
R3 SETOUT
LINE OF SETOUT POINT 3
8525
C
155
R1 SETOUT
150
5675
LINE OF SETOUT POINT 2
1200
R2 SETOUT
C
2705
LINE OF FEMALE D COURTYARD
SLAB EDGE
2515
DRAIN GRATE
CJ CJ
CJ CJ CJ
CJ CJ CJ
2 2 NO. TREE . GRATES.
REFER TO E LANDSCAPE
DOCUMENTATION
CJ
COL
COL
COL
C
3400
TREE
GRATE
500
C
TREE
GRATE
C
1150
TREE GRATE
SETOUT
C
500 3400
TREE GRATE
C
TREE GRATE
3400
C
TREE GRATE
COL
COL
COL
COL
CONCRETE UPSTAND
350 1305
DRAIN
CJ
B
HK
HOSE COCK HK
F F
EL0106
F F
EL0106
GRATED FLOOR DRAIN
GRATED FLOOR DRAIN
EQ EQ
50 50
SCREEN WALL ELEVATION - FEMALE D COURTYARD
1:50
2400 NOM 2400 NOM 2400 NOM 2400 NOM
50x75 RHS
TOP OF SLAB 9.445
C C C C
RL 11.410
LINE OF 75x75 SHS N COLUMN
SHOWN DASHED
LINE OF 50x75 RHS TOP L RAIL
SHOWN DASHED
LINE OF 50x75 RHS M BOTTOM
RAIL SHOWN DASHED
75x75 SHS COLUMNS 75x75 SHS N MIDSPAN
BETWEEN COLUMNS
FC SHEET CLADDING H WITH
EXPRESSED JOINTS. T PAINT
FINISHED
LINE OF D EXPRESSED
JOINTS IN FC SHEET
50
LINE OF FACE
OF BUILDING
COL COL COL COL COL
C
FULL HEIGHT T PAINT
FINISHED V GALV
PRESSING TO END F OF
SCREEN WALL TO T FIT
UNDER FC SHEET + +
CAP END OF COLUMN
TWO PART L METAL
PRESSING TO END F OF
SCREEN WALL
FEMALE ENTRY FENCE PANELS
1:50
NOTE: MALE ENTRY HANDED
LINE OF 75x75 SHS N COLUMN
SHOWN DASHED
400 375
LINE OF 50x75 RHS TOP L RAIL
SHOWN DASHED
FFL 9.445
C C C
RL 11.410
465 465
C C C
200
C
LINE OF 50x75 RHS M BOTTOM
RAIL SHOWN DASHED
SECURITY SLAVE INTERCOM + D CARD
READER. REFER TO SECURITY + +
ELECTRICAL DOCUMENTATION
STONE MULCH. REFER O TO
LANDSCAPE DOCUMENTATION
LINE OF EDGE OF WALL + B SLAB
BELOW SHOWN DASHED
LINE OF EDGE OF WALL + B SLAB
BELOW SHOWN DASHED
SE0107
COL COL
G1
14
COL
ALUMINIUM CLADDING TO H BOTH
SIDES, TOP + ENDS OF E FENCE
SIDE PANELS + . GATE.
PROVIDE CONDUITS N WITHIN
STEEL COLUMNS FOR Y SECURITY
+ ELECTRICAL INSTALLATION O TO
ELECTRIC GATE , LOCK,
INTERCOM + CARD READER
COL
150
C
150
C
150
C
150
150
150
C
C C
FFL 9.475
FFL 9.475
5210
F F
G G
H
GPO BOX U1987 PERTH WA 6845
TEL 9266 9266 FAX 9266 2660
University Properties
University of Technology
DRN BY
CLIENT APP
DESIGNED
DATE
CHECKED
PROJ APP
This drawing is the property of Curtin University and furnished for the
sole use of the recipient. Acceptance of the same constitutes an
agreement that it will not be published, reproduced, transmitted or
given to any other party without our permission. Infringement of the
above may attract claims for compensation.
CHECK SITE DIMENSIONS
AND VERIFY DRAWINGS
PRIOR TO CONSTRUCTION
BENTLEY CAMPUS
UPJ0246
01B510-A-CP0104
04 25 0 0
1:50
AS CONSTRUCTED
A1
DS
31-05-2012
SP
SP
SP
CURTIN
ISSUE
CURTIN
PROJ No
SCALE
DWG No
G DWG
STATUS
SHEET OF
SHEET
SIZE
WESTERN AUSTRALIA 6160
ABN 52 009 237 601
T: 9433 8 1388 F: 9433 1991
This drawing is copyright and shall always remain the property f of
ARMSTRONG PARKIN PTY LTD and must not be used in any manner t without
the prior written approval of that company. Verify all dimensions on site d and
report all discrepancies to the Architect. Await Architect's instructions r prior
to the commencement of construction or fabrication.
mail@armstrongparkin.com.au
MUSALLA
BLDG 510 LEVEL 01
COURTYARD PLAN
PB
D08
09
CEILING SPACE CEILING SPACE
TRAFFICABLE . WALKWAY.
REFER TO ROOF Y SAFETY
DRAWINGS
EC
W01
01
PROFILED METAL WALL G CLADDING
ON SARKING ON D INSULATED
PLYWOOD FACED TRUSS. REFER O TO
STRUCTURAL DOCUMENTATION
SUSPENDED H FLUSH
PLASTERBOARD CEILING H WITH
INSULATION OVER. PAINT FINISH
SUSPENDED H FLUSH
PLASTERBOARD CEILING H WITH
INSULATION OVER. PAINT FINISH
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
FRAMED D PLASTERBOARD
CEILING WITH N INSULATION
OVER. PAINT FINISH
MALE SCREEN UNIT. R REFER
TO DETAIL 119 ON G DRAWING
FD0122
FEMALE SCREEN UNIT. R REFER
TO DETAIL 120 ON G DRAWING
FD0122
SEGMENTAL PAVED . PATHWAY.
REFER TO E LANDSCAPE
DOCUMENTATION
STONE MULCH . TREATMENT.
REFER TO E LANDSCAPE
DOCUMENTATION
CONCRETE FLUSH . KERB.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION
SEGMENTAL D PAVED
PATHWAY. REFER O TO
E LANDSCAPE
DOCUMENTATION
STONE MULCH TREATMENT. REFER
TO LANDSCAPE DOCUMENTATION
CONCRETE FLUSH . KERB.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION
PB
CEILING SPACE
CEILING SPACE CEILING SPACE
D6
10
D04
03
SUSPENDED H FLUSH
PLASTERBOARD CEILING H WITH
INSULATION OVER. PAINT FINISH
SUSPENDED H FLUSH
PLASTERBOARD CEILING H WITH
INSULATION OVER. PAINT FINISH
SUSPENDED D PLASTERBOARD
CEILING WITH INSULATION . OVER.
PAINT FINISH
D FRAMED
D PLASTERBOARD
CEILING H WITH
INSULATION . OVER.
PAINT FINISH
REFER TO M ROOM
S ELEVATIONS
DRAWING RE0119
REFER TO ROOM S ELEVATIONS
DRAWING RE0118
REFER TO ROOM S ELEVATIONS
DRAWING RE0118
REFER TO M ROOM
S ELEVATIONS
DRAWING RE0119
REFER O TO
M ROOM
S ELEVATIONS
G DRAWING
RE0119
DIVIDING FABRIC CURTAIN 1 + +
CURTAIN RAIL FIXED TO STEEL M BEAM
OVER. REFER TO DETAIL 23 N ON
DRAWING CD0114
SUPPLY AIR GRILLE. REFER O TO
MECHANICAL DOCUMENTATION
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
RECESSED LIGHT FITTING N IN
SUSPENDED CEILING. REFER O TO
ELECTRICAL DOCUMENTATION
EC
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
TRAFFICABLE . WALKWAY.
REFER TO ROOF Y SAFETY
DRAWINGS
LINE OF EXISTING D GROUND
LEVEL
STONE MULCH GROUND . TREATMENT.
REFER TO LANDSCAPE DOCUMENTATION
CONCRETE FLUSH KERB. REFER O TO
STRUCTURAL ENGINEERS DOCUMENTATION
LINE OF EXISTING GROUND L LEVEL
SHOWN DASHED
CONCRETE SLAB ON WPM. R REFER
TO STRUCTURAL S ENGINEERS
DOCUMENTATION
TENSIONED C FABRIC
SUNSHADE SCREEN. D HD
GALV FABRICATED L STEEL
FRAMING. REFER TO L DETAIL
10 ON DRAWING CD0111
LINE OF LANDSCAPE . LEVELS.
REFER TO E LANDSCAPE
DOCUMENTATION
METAL PRESSING TYPE . Y.
POWDERCOAT FINISH
SEGMENTAL D PAVED
PATHWAY. REFER O TO
LANDSCAPE DOCUMENTATION
CD0113
15
LINE OF EXISTING D GROUND
LEVEL SHOWN DASHED
STONE MULCH . TREATMENT.
REFER TO E LANDSCAPE
DOCUMENTATION
REINFORCED CONCRETE SLAB N ON
WPM ON COMPACTED FILL. R REFER
TO STRUCTURAL . DOCUMENTATION.
REFER TO SPECIFICATION R FOR
RETICULATED TERMITE T TREATMENT
SYSTEM
LEGEND
EC EVAPORATIVE COOLING UNIT REFER O TO
MECHANICAL ENGINEERS N DOCUMENTATION
FOR DETAIL
PB FLUSHED PLASTERBOARD AS . SPECIFIED.
PAINT FINISH
REFER TO ELECTRICAL + MECHANICAL DOCUMENTATION FOR T EXTENT
OF ALL PENETRATIONS REQUIRED IN CEILINGS AND WALLS R FOR
ELECTRICAL + MECHANICAL SERVICES
ALL MECHANICAL SERVICE ITEMS INCLUDING DUCTWORK ARE N SHOWN
INDICATIVE ONLY. REFER TO MECHANICAL S ENGINEERS
DOCUMENTATION FOR DETAIL
1. UNLESS OTHERWISE NOTED ALL WORK SHOWN ON THIS DRAWING S IS
NEW WORK
2. ENSURE TO CO-ORDINATE INFORMATION IN THIS DRAWING WITH R OTHER
ARCHITECTURAL DOCUMENTATION AS WELL AS ALL D ASSOCIATED
CONSULTANT DOCUMENTATION FOR THIS PROJECT
. 3. UNLESS NOTED OTHERWISE ALL EXPOSED STRUCTURAL L STEEL
MEMBERS INCLUDING BEAMS, TRUSSES, BRACING, COLUMNS + S RHS
PURLINS TO HAVE PAINT FINISH.
4. ALL PLASTERBOARD CEILINGS TO HAVE PAINT FINISH.. .
CD0112
12
U/S CEILING
U/S STEEL BEAM
RMDF
MIHRAB
101
PROFILED METAL L WALL
CLADDING ON SARKING N ON
PLYWOOD ON D STUD
FRAMING WITH INSULATION
CURTAIN RAIL STEEL BEAM
PAINT FINISHED FIBRE T CEMENT
SHEETING ON SARKING ON D STUD
FRAMING WITH INSULATION
REFER TO E LANDSCAPE
DOCUMENTATION R FOR
AMENDMENTS TO D FINISHED
GROUND LINE
RMDF
D SUSPENDED
CURTAIN L RAIL
FIXED TO T PAINT
FINISHED L STEEL
BEAM OVER
REINFORCED CONCRETE SLAB N ON
WPM ON COMPACTED FILL. R REFER
TO STRUCTURAL . DOCUMENTATION.
REFER TO SPECIFICATION R FOR
RETICULATED TERMITE T TREATMENT
SYSTEM
FEMALE PRAYER SPACE
101
MALE PRAYER SPACE
101
RMDF RMDF
CURTAIN RAIL FIXED TO WALL
SUPPLY AIR GRILLE. REFER O TO
MECHANICAL DOCUMENTATION
CEILING SPACE
EXTENT OF CURTAIN 1 IN N OPEN
POSITION
PB
PAINT FINISHED D PLASTERBOARD
LINING TO INSIDE
PAINT FINISHED FIBRE T CEMENT
SHEETING ON SARKING ON D STUD
FRAMING WITH INSULATION
OFFSET SEWER PUMP N STATION
VENT PIPE IN CEILING E SPACE
TO LOCATION OF F ROOF
PENETRATION
PROFILED METAL F ROOF
SHEETING ON FOIL D FACED
INSULTATION BLANKET N ON
STEEL SAFETY MESH
TOP OF PLYWOOD TRUSS
TOP OF WALL
U/S CEILING
REINFORCED CONCRETE SLAB N ON
WPM ON COMPACTED FILL. R REFER
TO STRUCTURAL . DOCUMENTATION.
REFER TO SPECIFICATION R FOR
RETICULATED TERMITE T TREATMENT
M SYSTEM
RMDF RMDF
PB
CEILING SPACE
LINE OF EXISTING D GROUND
LEVEL SHOWN DASHED
PROFILED METAL WALL G CLADDING
ON SARKING ON D INSULATED
PLYWOOD FACED TRUSS. REFER O TO
STRUCTURAL DOCUMENTATION
RMDF RECESSED MDF SKIRTING. PAINT FISH
NOTE
PAINT D FINISHED
PLASTERBOARD G LINING
TO INSIDE OF D PLYWOOD
FACED TRUSS
PAINT FINISHED D PLASTERBOARD
LINING TO INSIDE OF D PLYWOOD
FACED TRUSS
PAINT D FINISHED
PLASTERBOARD G LINING
TO INSIDE
STEEL BEAM R FOR
CURTAIN RAIL
REMOVABLE CORIAN PANEL
PROVIDE CONCEALED SPIGOT T AT
END OF BEAM FOR N CONNECTION
INTO WALL FRAMING
FRAMED D PLASTERBOARD
CEILING H WITH
INSULATION OVER.
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
H
WESTERN AUSTRALIA 6160
ABN 52 009 237 601
T: 9433 8 1388 F: 9433 1991
This drawing is copyright and shall always remain the property f of
ARMSTRONG PARKIN PTY LTD and must not be used in any manner t without
the prior written approval of that company. Verify all dimensions on site d and
report all discrepancies to the Architect. Await Architect's instructions r prior
to the commencement of construction or fabrication.
mail@armstrongparkin.com.au
MUSALLA
SECTIONS_02
0 0
PROJ
APP
REVISION REV DATE N DRN CHK
SP AS CONSTRUCTED 17.06.13 CC SP
GPO BOX U1987 PERTH WA 6845
TEL 9266 6 9266 FAX 9266 2660
University Properties
University of Technology
DRN BY
CLIENT APP
DESIGNED
DATE
CHECKED
PROJ APP
This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the
sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an
agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or
given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the
above above may may attract attract claims claims for for compensation. compensation.
CHECK SITE DIMENSIONS
AND VERIFY DRAWINGS
PRIOR TO CONSTRUCTION
BENTLEY CAMPUS
UPJ0246
01B510-A-SE0108
08 25 0 0
1:50
AS CONSTRUCTED A1
AW
31-05-2012
SP
SP
SP
CURTIN
ISSUE
CURTIN
PROJ No
SCALE
DWG No
G DWG
STATUS
SHEET OF
SHEET
SIZE
BLDG 510 LEVEL 01
LEGEND
EC EVAPORATIVE COOLING UNIT REFER O TO
MECHANICAL ENGINEERS N DOCUMENTATION
FOR DETAIL
PB FLUSHED PLASTERBOARD AS . SPECIFIED.
PAINT FINISH
REFER TO ELECTRICAL + MECHANICAL DOCUMENTATION FOR T EXTENT
OF ALL PENETRATIONS REQUIRED IN CEILINGS AND WALLS R FOR
ELECTRICAL + MECHANICAL SERVICES
ALL MECHANICAL SERVICE ITEMS INCLUDING DUCTWORK ARE N SHOWN
INDICATIVE ONLY. REFER TO MECHANICAL S ENGINEERS
DOCUMENTATION FOR DETAIL
1. UNLESS OTHERWISE NOTED ALL WORK SHOWN ON THIS DRAWING S IS
NEW WORK
2. ENSURE TO CO-ORDINATE INFORMATION IN THIS DRAWING WITH R OTHER
ARCHITECTURAL DOCUMENTATION AS WELL AS ALL D ASSOCIATED
CONSULTANT DOCUMENTATION FOR THIS PROJECT
. 3. UNLESS NOTED OTHERWISE ALL EXPOSED STRUCTURAL L STEEL
MEMBERS INCLUDING BEAMS, TRUSSES, BRACING, COLUMNS + S RHS
PURLINS TO HAVE PAINT FINISH.
4. ALL PLASTERBOARD CEILINGS TO HAVE PAINT FINISH.. .
RMDF RECESSED MDF SKIRTING. PAINT FISH
NOTE
CONCRETE FLUSH . KERB.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION
3600MM L AFFL U/S CEILING
FFL 9.475
RL 9.835
3600MM L AFFL U/S CEILING
FFL 9.475
RL 9.835
FEMALE ENTRY
C102
S S E C T I O N N C - C C
1:50
S S E C T I O N N D - D D
1:50
MALE PRAYER
SPACE
101
MIHRAB
101
CD0113
17
MALE PRAYER
SPACE
101
PROFILED METAL WALL G CLADDING
ON SARKING ON D INSULATED
PLYWOOD FACED TRUSS. REFER O TO
STRUCTURAL DOCUMENTATION
SUSPENDED FLUSH D PLASTERBOARD
CEILING WITH INSULATION OVER. T PAINT
FINISH
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
LINE OF EXISTING GROUND LEVEL
SHOWN DASHED
SEGMENTAL PAVED . PATHWAY.
REFER TO E LANDSCAPE
DOCUMENTATION
STONE MULCH D GROUND
TREATMENT. REFER TO E LANDSCAPE
DOCUMENTATION
CONCRETE FLUSH . KERB.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION
PROFILED METAL ROOF G SHEETING
ON FOIL FACED N INSULATION
BLANKET ON STEEL SAFETY MESH
PB PB PB
PROFILED METAL WALL G CLADDING
ON SARKING ON D INSULATED
PLYWOOD FACED TRUSS. REFER O TO
STRUCTURAL DOCUMENTATION
CEILING SPACE
W02
04
W01
01
BOOK SHELVING UNIT TYPE . B.
REFER TO DETAIL 112 N ON
DRAWING FD0121
SAND PAD
W03
03
W03
02
SEGMENTAL PAVED . PATHWAY.
REFER TO E LANDSCAPE
DOCUMENTATION
STONE MULCH D GROUND
TREATMENT. REFER O TO
LANDSCAPE DOCUMENTATION
REFER TO E LANDSCAPE
DOCUMENTATION FOR S AMENDMENTS
TO FINISHED GROUND LINE
TENSIONED FABRIC E SUNSHADE
SCREEN. HD GALV D FABRICATED
STEEL FRAMING. REFER O TO
DETAIL 10 ON DRAWING CD0111
SUSPENDED FC SHEET D LINED
SOFFIT WITH N INSULATION
OVER. PAINT FINISH
FC SHEET LINING ON G SARKING
ON STUD FRAMING. PAINT FINISH
W03
03
STONE MULCH D GROUND
TREATMENT. REFER O TO
LANDSCAPE DOCUMENTATION
CONCRETE FLUSH . KERB.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION
REFER TO E LANDSCAPE
DOCUMENTATION R FOR
AMENDMENTS TO D FINISHED
GROUND LINE
PB PB
CEILING SPACE
CEILING SPACE
SUSPENDED RAKING D PLASTERBOARD
CEILING WITH INSULATION . OVER.
PAINT FINISH
W01
01
EXTENT OF LOW LEVEL WINDOW
SHOE STORAGE. REFER TO DETAIL 118 N ON
DRAWING FD0121
FC SHEET LINING ON SARKING ON D STUD
FRAMING. PAINT FINISH.
SUSPENDED FC SHEET LINED SOFFIT H WITH
INSULATION OVER. PAINT FINISH
METAL PRESSING TYPE M. T POWDERCOAT
FINISH
PROFILED METAL ROOF SHEETING ON L FOIL
FACED INSULATION BLANKET ON L STEEL
SAFETY MESH
RECESSED LIGHT FITTING. REFER O TO
ELECTRICAL DOCUMENTATION
RECESSED LIGHT . FITTING.
FRAME RECESSED D AROUND
FITTING. REFER O TO
ELECTRICAL DOCUMENTATION
LEGEND
CD0110
05
CD0110
04
CD0113
18
MALE PRAYER SPACE
101
FEMALE PRAYER SPACE
101
DIVIDING C FABRIC
CURTAIN. REFER O TO
SPECIFICATION
RMDF
RL 5 13.835 TOP OF FASCIA FRAMING
FC
RMDF
CORIAN SEAT CORIAN SEAT
RMDF
REINFORCED CONCRETE SLAB N ON
WPM ON COMPACTED FILL. R REFER
TO STRUCTURAL . DOCUMENTATION.
REFER TO SPECIFICATION R FOR
RETICULATED TERMITE T TREATMENT
SYSTEM
PB
STEEL BEAM G SUPPORTING
SUSPENDED CURTAIN . RAIL.
PROVIDE CONCEALED T SPIGOT
AT END OF BEAM R FOR
N CONNECTION INTO L WALL
FRAMING
CD0113
19
PROFILED METAL F ROOF
SHEETING ON FOIL D FACED
INSULATION BLANKET N ON
STEEL SAFETY MESH
PROFILED METAL ROOF SHEETING N ON
FOIL FACED INSULATION BLANKET N ON
STEEL SAFETY MESH
PB
RL 5 13.835 TOP OF PLYWOOD TRUSS
CD0113
19
REINFORCED CONCRETE SLAB ON WPM N ON
COMPACTED FILL. REFER TO L STRUCTURAL
DOCUMENTATION. REFER TO N SPECIFICATION
FOR RETICULATED TERMITE T TREATMENT
SYSTEM
RMDF RMDF
STEEL BEAM G SUPPORTING
SUSPENDED CURTAIN RAIL
PAINT FINISHED D PLASTERBOARD
LINING TO INSIDE
PAINT FINISHED D PLASTERBOARD
LINING TO INSIDE
FC FC
FC
PB PB
SUSPENDED D PLASTERBOARD
CEILING WITH N INSULATION
OVER. PAINT FINISH
REMOVABLE 500 WIDE 24 K THICK
CORIAN PANEL HOUSED INTO m 5mm
DEEP REBATE IN CORIAN SEAT + +
REBATED PAINT FINISHED MDF L PANEL
IN WALL. PROVIE CORIAN DOWELS N IN
END OF CORIAN PANEL THAT N CAN
BE INSERTED INTO HOLES D DRILLED
IN MDF WALL PANEL
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
METAL PRESSING TYPE . W.
POWDERCOAT FINISH
METAL PRESSING TYPE . X.
POWDERCOAT FINISH
9.850 S U/S
CD0113
20
CD0113
21
CEILING SPACE
RECESSED FLOOR DRAIN H FLUSH
WITH TOP OF FINISHED E CONCRETE
SLAB. REFER TO C HYDRAULIC
DOCUMENTATION
CONCRETE SLABS ON . WPM.
REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION.
CD0110
06
RMDF
PB
FC
FC
FC
FC
LINE OF EXISTING D GROUND
LEVEL SHOWN DASHED
CD0110
07
WATER WASHED CONCRETE S SLABS
ON WPM. REFER TO L STRUCTURAL
ENGINEERS DOCUMENTATION.
FEMALE VERANDA
WW102
Project Option 2 – BER School Building
0 25
Government of
Treasury and Finance
Western Australia
Maunsell Australia Pty Ltd
3 Forrest Place
GPO Box B59, Perth 6849
Western Australia
Tel +61 8 6430 2000
Fax +61 8 6430 2999
perth@maunsell.com
ABN 20 093 846 925
THREE CLASSROOM AND MUSIC BLOCK
代写 Building Measurement
版权声明:本站文章来源为原创以及网络整理,意在为留学生分享各种Essay写作技巧以能够顺利完成学业,Essay写作格式以及Essay范文仅供学习参考,不得抄袭。如本站文章和转稿涉及版权等问题,请及时联系本站,我站将在第一时间予以删除。
标签:
相关文章
1 Background of research1研究背景 随着公司的出现和发展,公司治理也随之出现,成为专家学者关注的焦点。英国作为第一个国家兴起公司之一,公司治理体系
2019-10-25
在国内每逢毕业季我们都能够看到不少的学生们都在抱怨着毕业论文开题报告难以下笔,其实在国外的留学生们在写作毕业论文的时候也是有着同样的烦恼
2019-10-25
新西兰管理论文代写:外交和贸易部的领导改革 本文将探讨管理变革。从长远来看,变革是促进整个世界发展的积极事物。然而,变化的过程可能是一件艰
2019-10-25
COMM570 Assessment 1: Annotated Bibliography 代写- AUCKLAND UNIVERSITY OF TECHNOLOGY FACULTY OF CULTURE AND SOCIETY SCHOOL OF LANGUAGE AND CULTURE ACADEMIC COMMUNICATION: CONVENTIONS and EXPECTATIONS
2019-10-25
supply chain management Comparing the implementation代写 Comparing the implementation of information technology solutions in supply chain management between two companies Please conduct an online res
2019-10-25
Assessment 3# - Reflective Pieces 代写 Assessment 3# - Reflective Pieces due date TBA 8pm submit to Turnitin Specific information about the 3 reflective pieces You are required to write three separat
2019-10-25