首页 - Coursework > 代写 SSUD 71-308 Project Contract Administration

代写 SSUD 71-308 Project Contract Administration

发布于2019-10-25 微信essayok 阅读:

SSUD 71-308 Project Contract Administration Assignment 2 Due: Week 11 Friday 1 April 2015 by 4pm Assignments must be submitted using the iLearn Portal for this subject. A hard copy hand in is not necessary. SSUD71-308 Project Contract Administration  Assignment 2 1 Assignment 2 Guidelines Due date: To be received no later than 4:00pm, Friday 1 April 2016 (end of Week 11). Hand-In:  Hand in by the due date through the iLearn subject portal. Notes on plagiarism: Whilst we expect a great deal of quoting from the contract which will show up on Turnitin, we do not want copying from other student’s work. The first type of copying is expected and encouraged. The second is not permitted and could result in marks being deducted or the assignment being rejected. Answer: All five questions must be answered. Use MW-1 and AS 4000 citing clauses where necessary. Select one of the contracts being studied and answer all questions in terms of that contract. You do NOT need to answer the questions using both contracts. Note the contract you have chosen in the answer. You may switch contracts between answers if this suits you. Marking:  25% of subject assessment. All questions are of equal weighting (5 x 5%). Format: All Questions are brief essays (half a page or not more than one page in length). You should be focused on giving the facts clearly and concisely. Be sure to describe clearly the issue requiring attention and to cite: * the contractual basis for your comments and answer; * quote relevant contract clauses to support your statements/comments; * the time frame within which an action must be taken in response; and * the consequences of failure to take such action. Length: No greater than is absolutely necessary to convey the intended message in accordance with the requirements of the contract. Comments: All the Questions are generally based on the Topics 5-9 in Goldfayl. Reference to the contracts and to the prescribed text are encouraged. Assignment 2  SSUD12-308 Project Contract Administration 2  Question 2.1 (5%) a. Define a variation under the contract. b. Why do we need variations in a lump sum building contract? c. Who can authorise variations? Question 2.2 (5%) Using your selected contract trace the steps (in dot-point form, flowcharts or brief descriptions) to notify, submit, assess and resolve a dispute involving a time extension claim that involves concurrent delays. Question 2.3 (5%) a. Describe the costs and expenses caused by delay and disruption b. Explain how these costs can be recovered by the contractor. Question 2.4 (5%) Using your selected contract trace the steps (in dot-point form, flowcharts or brief descriptions) involved in preparing a regular progress claim and which identifies the parties involved and the time scale for making such a progress payment claim. Question 2.5 (5%) Using your selected contract trace the steps (in dot-point form, flowcharts or brief descriptions) involved in the procedure for making administering a routine Practical Completion notice by the contractor.  

二维码

扫一扫关注我们

版权声明:本站文章来源为原创以及网络整理,意在为留学生分享各种Essay写作技巧以能够顺利完成学业,Essay写作格式以及Essay范文仅供学习参考,不得抄袭。如本站文章和转稿涉及版权等问题,请及时联系本站,我站将在第一时间予以删除。

标签:

相关文章